Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

Get Feb-2025 Download Latest & Valid Questions For SAP C_TS422_2023 exam [Q47-Q64]

Share

Get Feb-2025 Download Latest & Valid Questions For SAP C_TS422_2023 exam

Ensure Success With Updated Verified C_TS422_2023 Exam Dumps


SAP C_TS422_2023 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Capacity Planning in SAP S
  • 4HANA: This section covers a discussion of SAP S
  • 4HANA best practices, SAP HANA database concept, SAP Fiori user experience, and embedded analytics capabilities.
Topic 2
  • Production Orders in SAP S
  • 4HANA: This section covers BOM item categorization, order status management, availability checks, routing selection, order type setup, and material handling processes.
Topic 3
  • Advanced Planning in SAP S
  • 4HANA: This section includes an overview of advanced planning fundamentals and master data. Explanation of key tools and processes. Discussion of planning evaluation concepts.
Topic 4
  • Process Orders in SAP S
  • 4HANA: This section covers an introduction to process order components, processing, and relevant master data objects. Overview of Good Manufacturing Practices (GMP) features.
Topic 5
  • Introduction to SAP S
  • 4HANA Supply Chain Planning: This part covers the background and motivation for SAP S
  • 4HANA, its main components, business applications, and user experience strategy.

 

NEW QUESTION # 47
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do?
Note: There are 2 correct answers to this question.

  • A. Add the agreement to the quota arrangement mark it for MRP relevance.
  • B. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
  • C. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • D. Add the agreement to the source list mark it for MRP relevance.

Answer: C,D


NEW QUESTION # 48
Your company produces a finished good based on a forecast expects it to be in stock when customers order it. If customers order more than the forecasted quantity this must NOT have any impact on the production program.
Which planning strategy do you use?

  • A. Planning with final assembly (40)
  • B. Maketostock production (10)
  • C. Assembly processing with production orders (82)
  • D. Planning without final assembly (50)

Answer: B


NEW QUESTION # 49
How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question.

  • A. They are created with exact times in Advanced Planning.
  • B. They are created on assembly level during the planning run.
  • C. They are only created for multilevel bill of material (BOM) structures.
  • D. They are created together with the independent requirement for the finished product.

Answer: A,B


NEW QUESTION # 50
You want to use capacity availability checks for production orders.
Which settings have to be made for this?
Note: There are 2 correct answers to this question.

  • A. An overall profile must be assigned in the checking control.
  • B. The scope of check must be defined in Customizing.
  • C. A checking rule must be assigned to the work centers.
  • D. The Relevant for Finite Scheduling indicator must be set.

Answer: A,D


NEW QUESTION # 51
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched.
How does the insertion take place?

  • A. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
  • B. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
  • C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • D. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

Answer: D


NEW QUESTION # 52
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation that is ordered according to the network structure of all related products represents the coverage of issue elements with receipt elements stock
  • B. An evaluation to identify material or capacity shortages in the billofmaterial structure after the production planning run
  • C. An evaluation to identify overstock situations in the balance between the receipt the issue elements after the production planning run
  • D. An evaluation that is ordered according to the billofmaterial structure of all related products represents the relationship between the receipt the issue elements

Answer: D


NEW QUESTION # 53
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA.
When can you use mode selection?

  • A. When multiple operations are maintained for one product
  • B. When multiple planned orders exist on one resource
  • C. When alternative resources are used within one operation
  • D. When multiple production versions are maintained for one product

Answer: C

Explanation:
Mode selection is a feature that allows the system to choose the best mode for an activity based on the mode priority and the available capacity of the resources. A mode is a combination of a resource and a formula that determines the duration and quantity of an activity. An operation can have multiple activities, each with multiple modes. Mode selection can be used when an operation contains several activities, each of which is assigned several modes for different resources, and the system needs to determine which resource to use for each activity. Mode selection can also be used when an activity has several modes for the same resource, and the system needs to determine which formula to use for the activity. Mode selection can be performed during the planning explosion or during the interactive planning. Reference: Mode Selection | SAP Help Portal, Mode Selection | SAP Help Portal


NEW QUESTION # 54
You are a consultant on an SAP S/4HANA Cloud Greenfield project.
Which of the following aspects should you focus on to achieve maintain clean core data quality? Note:
There are 2 correct answers to this question.

  • A. Efficiency
  • B. Stability
  • C. Accuracy
  • D. Timeliness

Answer: A,B


NEW QUESTION # 55
You want to set up a maketoorder planning scenario for a finished product. The bill of material contains two components: one should be procured for eac sales order individually the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

  • A. Choose planning strategy 50 (Planning without final assembly) select the corresponding Mixed MRP indicator.
  • B. Choose planning strategy 20 (MaketoOrder) select the corresponding Individual/Collective indicator.
  • C. Choose planning strategy 20 (MaketoOrder) select the corresponding Mixed MRP indicator.
  • D. Choose planning strategy 50 (Planning without final assembly) select the corresponding Individual/Collective indicator.

Answer: B


NEW QUESTION # 56
What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question

  • A. Move time
  • B. Teardown time
  • C. Queue
  • D. Setup Time

Answer: B,D

Explanation:
The time element of midpoint scheduled operations that can be reduced by reduction strategy settings while dispatching are teardown time and setup time. Teardown time is the time required to dismantle the production equipment after the operation is completed. Setup time is the time required to prepare the production equipment before the operation is started. Both teardown time and setup time can be influenced by the reduction strategy settings, which define the percentage of reduction and the minimum duration for each time element. The reduction strategy settings can be maintained in the work center or the routing. The system applies the reduction strategy settings when dispatching the operations to the resources in the planning board or the product view. Reference: SAP S/4HANA Manufacturing for Planning & Scheduling - Implementation Guide, page 32; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 81.


NEW QUESTION # 57
How can you achieve a feasible production plan in case of capacity constraints?
Note: There are 3 correct answers to this question.

  • A. Determine a time period with available capacity on the planning board.
  • B. Form optimum sequences to reduce setup times.
  • C. Increase the capacity supply in a timephased interval.
  • D. Execute an infinite production planning run for the critical resources.
  • E. Reduce the planning time interval.

Answer: A,B,C


NEW QUESTION # 58
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.

  • A. Use batch determination
  • B. Use the Batch Information Cockpit.
  • C. Use the batch where-used list.
  • D. Use batch derivation.

Answer: B,C

Explanation:
To identify all affected finished goods stocks that contain a deviated raw material batch, you can use the following tools:
The Batch Information Cockpit (BIC) is a central tool that provides an overview of all relevant information and documents related to a batch. You can use the BIC to display the batch genealogy, which shows the hierarchical relationships between batches along the production and distribution process. You can also use the BIC to display the batch traceability, which shows the chronological sequence of events and transactions that affect a batch. The BIC allows you to analyze the batch history and the batch usage across different plants and systems.
The batch where-used list is a tool that determines how a batch is created and used in Production Planning (PP) through various stages of production and displays the result in a list. You can use the batch where-used list to find out in which other batches a batch was used and from which other batches a batch was created. This is important in the case of complaints and questions about product safety if the composition of semi-finished and finished products has to be documented across all production levels.
Batch derivation and batch determination are not tools to identify affected finished goods stocks, but rather tools to assign batches to production orders or sales orders based on certain criteria. Batch derivation is a process of transferring characteristics or values from one batch to another, while batch determination is a process of finding suitable batches for a requirement based on predefined conditions. Reference: Batch Information Cockpit | SAP Help Portal, Batch Where-Used List | SAP Help Portal.


NEW QUESTION # 59
How can a material availability check be triggered automatically for a production order?
Note: There are 2 correct answers to this question.

  • A. By order confirmation
  • B. By order release
  • C. By capacity planning
  • D. By mass processing

Answer: B,D

Explanation:
A material availability check can be triggered automatically for a production order by the following methods:
By mass processing: You can use the mass processing function to execute material availability checks for multiple production orders at once. You can use the Manage Production Orders app or the transaction COHV to perform mass processing. You can define the selection criteria and the scope of check for the orders to be checked. The system updates the availability status and the committed quantities for the checked orders.
By order release: You can configure the system to trigger a material availability check automatically when a production order is released. You can use the Customizing activity Define Checking Control to define the checking rule and the scope of check for the order release. The system updates the availability status and the committed quantities for the released order. Reference: Executing Material Availability Checks; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 83.


NEW QUESTION # 60
Where does the system check master data selection settings during the creation of planned orders production orders? Note: There are 3 correct answers to this question.

  • A. In the MRP controller
  • B. In the routing
  • C. In the bill of material (BOM)
  • D. In the work centers
  • E. In the production version

Answer: A,B,C


NEW QUESTION # 61
How can you support a GMP (Good Manufacturing Practice)-compliant production process?
Note: There are 3 correct answers to this question.

  • A. Digital signature
  • B. Batch record
  • C. Approved resources
  • D. Recipe approval
  • E. GMP-compliant flag

Answer: A,B,D

Explanation:
To support a GMP-compliant production process, you can use the following features in SAP S/4HANA:
Digital signature: This allows you to electronically sign documents and transactions that are relevant for GMP compliance, such as production orders, process orders, batch records, and quality inspections. Digital signatures ensure the authenticity, integrity, and non-repudiation of the documents and transactions12.
Batch record: This is a document that records the entire production process of a batch, including the materials, resources, operations, quality data, and signatures involved. Batch records provide traceability and documentation for GMP compliance3 .
Recipe approval: This is a process that ensures that only approved recipes can be used for production. Recipes are approved by authorized users who sign them digitally. Recipe approval prevents unauthorized changes and ensures consistency and quality of the products .
Reference:
1: SAP Help Portal: Digital Signature
2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 8: Product Compliance
3: SAP Help Portal: Batch Record
4: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 8: Product Compliance
5: SAP Help Portal: Recipe Approval
6: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 7: Process Orders


NEW QUESTION # 62
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track use this information in all areas of logistics?

  • A. Batch management
  • B. Quality management
  • C. Process order management
  • D. Engineering change management

Answer: A


NEW QUESTION # 63
Under what circumstances can you change the material type for a material if stocks reservations or purchasing documents exist? Note: There are 2 correct answers to this question.

  • A. The same base unit of measure is used.
  • B. The same batch management level is used.
  • C. The same account category is used.
  • D. The quantity value updates are the same.

Answer: C,D


NEW QUESTION # 64
......

Exam Materials for You to Prepare & Pass C_TS422_2023 Exam: https://prepaway.dumptorrent.com/C_TS422_2023-braindumps-torrent.html