Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

Authentic Best resources for SAFe-SASM Test Engine Practice Exam [Q26-Q50]

Share

Authentic Best resources for SAFe-SASM Test Engine Practice Exam

[2025] SAFe-SASM PDF Questions - Perfect Prospect To Go With DumpTorrent Practice Exam

NEW QUESTION # 26
What is the purpose of the fishbone diagram?

  • A. To identify the biggest root cause
  • B. To identify improvement backlog items
  • C. To identify potential root causes to problems
  • D. To brainstorm solutions to problems

Answer: C

Explanation:
The fishbone diagram, also known as an Ishikawa diagram or cause-and-effect diagram, is a tool used to systematically identify potential root causes of a problem. It helps teams brainstorm and categorize the possible causes of problems to identify root issues.
* Problem Statement:Clearly defines the problem at the head of the fishbone diagram.
* Categories:Major categories (e.g., methods, materials, equipment, people, environment, etc.) are identified and drawn as "bones" branching off from the main "spine."
* Brainstorming:Each category is explored to list possible causes, which are added as smaller bones off the main categories.
* Analysis:The team analyzes the diagram to identify which causes are most likely contributing to the problem.
This method helps teams to visually map out and drill down into all possible causes of a problem, leading to more thorough and effective problem-solving.
SAFe Scrum Master References:
* SAFe Advanced Scrum Master Training Material, Chapter on Problem-Solving Techniques.


NEW QUESTION # 27
An Agile Team decides they want to use pair programming in future Iterations. Where should this be captured?

  • A. In the Program Backlog
  • B. In the team retrospective notes
  • C. In the team's improvement backlog
  • D. In the Inspect and Adapt meeting notes

Answer: B

Explanation:
The decision to implement pair programming in future iterations is a team-level improvement action that stems from reflecting on their current processes and identifying areas for enhancement. This is best captured during the team's retrospective:
* Retrospective Purpose:The retrospective is a regular meeting where the team reflects on what went well, what didn't, and what could be improved.
* Action Items:Decisions and action items, such as adopting pair programming, are documented in the retrospective notes to ensure they are followed up in future iterations.
* Continuous Improvement:Capturing this in the retrospective notes ensures the team is committed to continuous improvement and has a clear record of their decisions and plans for process enhancements.
SAFe Scrum Master References:
* SAFe Advanced Scrum Master Training Material, Chapter on Team Retrospectives.


NEW QUESTION # 28
What are three opportunities for creating collaboration on a team? (Choose three.)

  • A. Backlogrefinement
  • B. Iteration planning
  • C. Inspect and Adapt
  • D. Communities of Practice
  • E. Pair work
  • F. Hackathons

Answer: D,E,F

Explanation:
Creating collaboration opportunities on a team is essential for fostering a cooperative and innovative environment. Three effective opportunities for collaboration include:
* Pair work (A): Pair programming or pairing on tasks allows team members to work closely together, share knowledge, and improve the quality of their work through constant feedback and collaboration.
* Communities of Practice (C): These are groups of people who share a common interest in a particular domain or practice. They provide a platform for sharing best practices, discussing challenges, and developing new skills collaboratively.
* Hackathons (E): Hackathons are events where team members come together to work intensively on projects, often with a focus on innovation and creative problem-solving. These events foster collaboration, creativity, and rapid prototyping.
SAFe Scrum Master References
* SAFe Principles: fostering a collaborative culture
* SAFe 5.0 framework: encouraging team collaboration through various practices and events


NEW QUESTION # 29
What is the primary goal of decentralized decision-making?

  • A. To resolve dependencies
  • B. To empower knowledge workers
  • C. To reduce delay
  • D. To minimize VVIP www

Answer: C

Explanation:
Decentralized decision-making is a principle in SAFe aimed at distributing decision authority to the people closest to the information and most affected by the decisions. The primary goal of decentralized decision-making is to reduce delay in the decision-making process, which can often occur when decisions need to pass through multiple layers of hierarchy. By empowering individuals and teams to make decisions quickly, organizations can respond faster to changes, improve agility, and maintain a steady flow of work.


NEW QUESTION # 30
During Iteration planning, the Product Owner introduces multiple new Stories to the team. Following a discussion, the team is unclear on the scope of the work and adds spikes into the Iteration for research. How should a Scrum Master help resolve this issue?

  • A. Ensure the Product Owner and the team arrived at the planning session with proper preparation
  • B. Have the team work on the Stories and identity the dependencies as they go
  • C. Discourage the team from creating spikes so they can focus on other Stories
  • D. Allow the team to finish planning and commit to Stories with existing unknowns

Answer: A

Explanation:
To resolve the issue of the team being unclear on the scope of new stories during Iteration planning, the Scrum Master should ensure that both the Product Owner and the team come to the planning session well-prepared.
Proper preparation involves:
* The Product Owner refining and prioritizing the backlog items before the planning session, ensuring that stories are well-defined and understood.
* The team reviewing the backlog items ahead of the planning session, allowing them to ask questions and clarify any uncertainties.
* Conducting pre-planning sessions or backlog refinement meetings to discuss and break down stories, ensuring they are ready for planning.
This preparation helps ensure that the planning session is productive and that the team can commit to well-understood and scoped stories.
SAFe Scrum Master References
* SAFe Iteration Planning guidelines
* SAFe 5.0 framework: ensuring effective preparation for planning sessions


NEW QUESTION # 31
What is the primary measurement during Inspect and Adapt?

  • A. Number of Features delivered
  • B. Team NPS score
  • C. Number of automated tests
  • D. Program predictability measure

Answer: D

Explanation:
The primary measurement during the Inspect and Adapt (I&A) event in SAFe is the program predictability measure. This metric assesses the Agile Release Train's (ART) ability to deliver on its commitments within a Program Increment (PI). It helps teams understand how accurately they can plan and execute work, providing a basis for continuous improvement. By focusing on predictability, organizations can improve their planning processes, align better with business objectives, and ensure more reliable delivery of value.


NEW QUESTION # 32
What is one way a Scrum Master can gain the confidence of a stakeholder?

  • A. Make sure the results of the retrospectives are made public
  • B. Invite the stakeholder to the Iteration retrospective
  • C. Make the process visible
  • D. Establish a daily sync meeting with the stakeholder

Answer: C

Explanation:
One way a Scrum Master can gain the confidence of a stakeholder is by making the process visible.
Transparency is a key principle in Agile and SAFe, as it builds trust and ensures that stakeholders are well-informed about the progress, challenges, and successes of the team. By making the process visible through tools like information radiators, progress charts, and regular updates, the Scrum Master can demonstrate accountability, foster open communication, and build stakeholder confidence in the team's ability to deliver value.
SAFe Scrum Master References
* SAFe Principles: transparency and visibility
* SAFe 5.0 framework: building stakeholder confidence through visible processes


NEW QUESTION # 33
What is one outcome of an integration point?

  • A. It aligns with a phase-gate milestone
  • B. It provides the opportunity to release code
  • C. It extends the length of time of an Iteration
  • D. It provides an opportunity to pivot the course of action

Answer: D

Explanation:
Integration points in agile development serve as critical junctures where progress is reviewed, and decisions can be made on whether to continue on the current path or pivot based on new information.
* Integration Points:Regular integration points help in verifying progress, ensuring alignment with objectives, and assessing whether the current approach is delivering the desired outcomes.
* Pivot or Persevere:These points provide the opportunity to pivot if necessary. Teams can change their course of action based on feedback, new insights, or changing requirements, ensuring that the final product meets the needs effectively.
* Risk Mitigation:Regular integration reduces the risk of late discovery of issues and ensures that the product evolves in a way that adds value continuously.
SAFe Scrum Master References:
* SAFe Advanced Scrum Master Training Material, Chapter on Iteration Execution.


NEW QUESTION # 34
The Agile Team includes the Scrum Master and which other key role?

  • A. Project Manager
  • B. Product Owner
  • C. Product Manager
  • D. Release Train Engineer

Answer: B

Explanation:
* Agile Team Composition:According to SAFe, an Agile Team is composed of cross-functional members who work together to deliver value. The team includes:
* Scrum Master:Facilitates the team's processes, helps remove impediments, and supports continuous improvement.
* Product Owner:Represents the customer and stakeholders, prioritizes the backlog, and ensures the team is working on the most valuable items.
* Developers:The team members who design, build, and test the product.
* Key Role:The Product Owner is essential to the Agile Team as they provide the vision, set priorities, and ensure that the team is delivering value that aligns with the customer and business needs.
SAFe Scrum Master References:
* The SAFe framework emphasizes the critical role of the Product Owner within the Agile Team, ensuring alignment and effective backlog management.


NEW QUESTION # 35
If the distance between the arrival and departure curves on a team's cumulative flow diagram is growing apart, what is likely happening?

  • A. WIP is decreasing
  • B. Lead time is increasing
  • C. Unplanned work is pushed into the backlog
  • D. The backlog is being reprioritized

Answer: B

Explanation:
* Cumulative Flow Diagram (CFD):A CFD is a visual tool used in Kanban and Scrum to show the progress of work items through different stages of the workflow over time.
* Arrival and Departure Curves:These curves represent the work items entering (arrival) and leaving (departure) the system.
* Growing Distance:If the distance between the arrival and departure curves on the CFD is growing apart, it indicates that work items are taking longer to move through the system.
* Lead Time:This term refers to the total time from when a work item is created until it is completed. An
* increasing distance between the curves means that work items are spending more time in the system, thus increasing the lead time.
SAFe Scrum Master References:
* SAFe materials on flow metrics and Kanban principles highlight the importance of monitoring lead time and using CFDs to identify bottlenecks and inefficiencies in the workflow.


NEW QUESTION # 36
What is one output from the problem-solving workshop?

  • A. ROAMed risks
  • B. Top improvement items for the next PI
  • C. All the potential Solutions the team could identify
  • D. An assessment report

Answer: B

Explanation:
One of the primary outputs from the problem-solving workshop in SAFe is identifying the top improvement items for the next Program Increment (PI). These workshops focus on analyzing issues, determining root causes, and formulating actionable improvements. By prioritizing and committing to these improvement items, teams can systematically address problems and enhance their performance and productivity in subsequent PIs.


NEW QUESTION # 37
Which statement is true about batch size, lead time, and utilization?

  • A. There is no direct relationship between lead time and utilization
  • B. As batch size increases, lead time decreases
  • C. There is no direct relationship between lead time and batch size
  • D. Higher team member utilization leads to longer lead times

Answer: D

Explanation:
Utilization refers to the percentage of a team's capacity that is being used. When team members are highly utilized (i.e., their capacity is nearly fully booked), it often leads to longer lead times. This is because:
* High utilization reduces the team's flexibility to handle new or unexpected work.
* It can cause bottlenecks as individuals or teams become overburdened with tasks.
* There is less room for managing variability, leading to delays and increased cycle times.
In contrast, lower utilization rates typically allow for more flexibility and quicker response times, reducing lead times. Therefore, higher utilization generally results in longer lead times due to increased bottlenecks and reduced capacity to handle new tasks efficiently.
SAFe Scrum Master References
* SAFe Advanced Scrum Master learning materials
* Principles of Lean-Agile development: optimizing flow by managing queue lengths and reducing batch sizes to improve lead times and throughput.


NEW QUESTION # 38
How is average lead time measured in a Kanban system?

  • A. Measure the vertical distance between arrival and departure lines on a cumulative flow diagram
  • B. Measure the horizontal distance between arrival and departure lines on a cumulative flow diagram
  • C. Measure the lead time for at least three items and calculate the statistical mean of the items
  • D. By taking the average velocity over the last three iterations

Answer: B

Explanation:
In a Kanban system, average lead time is measured by observing the horizontal distance between the arrival and departure lines on a cumulative flow diagram (CFD). The CFD visualizes the flow of work items through various stages of the workflow. The horizontal distance between thepoints where work items enter and leave a particular stage represents the lead time. By calculating this distance over multiple items, teams can determine the average lead time, providing insights into process efficiency and areas for potential improvement.


NEW QUESTION # 39
What is the output of an Inspect and Adapt event?

  • A. A new backlog for the team to work on in the upcoming PI
  • B. An updated Program Board
  • C. A refined understanding of the problem statement
  • D. A set of improvement items for the upcoming PI Planning event

Answer: D

Explanation:
The Inspect and Adapt (I&A) event is a critical component in the SAFe framework, held at the end of each Program Increment (PI). The main output of the I&A event is a set of improvement items that are intended to be actioned in the next PI Planning event. This helps in ensuring continuous improvement in the process and products.
* PI System Demo:Demonstrates the current state of the solution and provides an opportunity for the stakeholders to inspect the progress.
* Quantitative Measurement:Teams review metrics that reflect the current state of the development process.
* Problem-Solving Workshop:Identifies root causes of the biggest problems and formulates improvement items.
* Improvement Backlog:The improvement items identified are prioritized and added to the team's backlog for the next PI.
This cycle of continuous feedback and improvement helps in refining the development process and enhancing the team's performance.
SAFe Scrum Master References:
* SAFe Advanced Scrum Master Training Material, Chapter on Inspect and Adapt.


NEW QUESTION # 40
When is collaboration with System Architects and the Systems Team likely to have the greatest impact on Solution development?

  • A. During the daily stand-up
  • B. At the System Demo
  • C. During PI Planning
  • D. At the Inspect and Adapt event

Answer: C


NEW QUESTION # 41
If a team insists that big Stories cannot be split into smaller ones, how would the Scrum Master coach them to do otherwise?

  • A. Invite a development manager to emphasize the importance of splitting Stories
  • B. Emphasize the SAFe principles to highlight the importance of flow
  • C. Demonstrate Story-splitting techniques using a specific example
  • D. Suggest a story-splittingbootcamp in the next IP iteration

Answer: C

Explanation:
When a team struggles with breaking down large stories into smaller ones, the Scrum Master can coach them by demonstrating specific story-splitting techniques. This hands-on approach provides practical examples of how large stories can be decomposed into smaller, more manageable tasks. Techniques might include splitting by workflow steps, by business rules, by user roles, or by data boundaries. By using a specific example, the Scrum Master can illustrate the process and benefits, helping the team develop this essential skill.
SAFe Scrum Master References
* SAFe Agile Principles: continuous delivery of value
* SAFe 5.0 framework: techniques for effective story splitting


NEW QUESTION # 42
During Iteration planning, the Product Owner introduces multiple new Stories to the team. Following a discussion, the team is unclear on the scope of the work and adds spikes into the Iteration for research. How should a Scrum Master help resolve this issue?

  • A. Ensure the Product Owner and the team arrived at the planning session with proper preparation
  • B. Have the team work on the Stories and identity the dependencies as they go
  • C. Discourage the team from creating spikes so they can focus on other Stories
  • D. Allow the team to finish planning and commit to Stories with existing unknowns

Answer: A


NEW QUESTION # 43
Systems builders and Customers have a high level of responsibility and should take great care to ensure that any investment in new Solutions will deliver what benefit?

  • A. The necessary economic benefit
  • B. The best ecological benefit for society
  • C. The necessary financial benefit
  • D. The best opportunity for team utilization

Answer: A

Explanation:
In SAFe, systems builders and customers bear a significant responsibility to ensure that investments in new solutions deliver the necessary economic benefit. This means that any investment should provide value that justifies the costs and efforts involved. The focus on economic benefit helps ensure that resources are used effectively and that the solutions developed contribute positively to the organization's financial health.
SAFe Scrum Master References
* SAFe Lean-Agile Principles: economic view and value delivery
* SAFe 5.0 framework: ensuring investments align with economic benefits


NEW QUESTION # 44
What is one requirement for achieving Continuous Deployment?

  • A. Create all Features using behavior-driven development
  • B. Couple development cadence and deployment cadence
  • C. Decouple deployment from release
  • D. Automate all unit-tests

Answer: C

Explanation:
Achieving Continuous Deployment involves several practices, one of which is decoupling deployment from release. This means that code can be deployed to production continuously and automatically, but it is only released to end-users when it is appropriate. Decoupling these processes allows for more frequent and reliable deployments without affecting the user experience until the features are ready for release. This practice helps in maintaining system stability and enabling faster feedback loops.
SAFe Scrum Master References
* SAFe Continuous Delivery Pipeline: practices for Continuous Deployment
* SAFe 5.0 framework: decoupling deployment and release for continuous improvement


NEW QUESTION # 45
The purpose of Continuous Integration is to deliver what?

  • A. Smaller batch sizes
  • B. Potentially deployable code
  • C. New builds on the test environment
  • D. Specific customer functionality

Answer: B

Explanation:
Continuous Integration (CI) is a practice where code changes are automatically built, tested, and merged into a shared repository multiple times a day. The main purpose of CI is to ensure that the codebase is always in a state that could be potentially deployable. This means that any integration issues are identified and addressed as soon as possible, reducing the chances of bugs slipping into production.
* Frequent Integration:Developers frequently integrate their code changes into the main repository, often several times a day.
* Automated Builds:Each integration is verified by an automated build to detect integration errors as quickly as possible.
* Automated Testing:Along with building, automated tests are run to ensure new changes do not break existing functionality.
* Feedback Loop:Quick feedback is provided to the development team, allowing them to fix issues promptly.
By maintaining a potentially deployable codebase, teams can deliver high-quality software more rapidly and with greater confidence.
SAFe Scrum Master References:
* SAFe Advanced Scrum Master Training Material, Chapter on Continuous Integration.


NEW QUESTION # 46
What should be the first step a team should take to feed potential problems into the Problem Solving workshop?

  • A. Analyze quantitative & qualitative metrics
  • B. Identify enablers needed to build out the Architectural Runway
  • C. Conduct a short team retrospective
  • D. Review feedback from the System Demo

Answer: A

Explanation:
The first step a team should take to feed potential problems into the Problem Solving workshop is to analyze quantitative and qualitative metrics. These metrics provide objective data about the team's performance and can highlight areas where issues may be occurring. By reviewing these metrics, the team can identify trends, pinpoint specific problems, and prioritize them for discussion in the Problem Solving workshop. This approach ensures that the workshop focuses on data-driven issues, leading to more effective and targeted solutions.
SAFe Scrum Master References
* SAFe 5.0 framework: importance of data-driven decision-making and problem-solving
* SAFe Advanced Scrum Master learning materials: analyzing metrics for continuous improvement


NEW QUESTION # 47
When is collaboration with System Architects and the Systems Team likely to have the greatest impact on Solution development?

  • A. During the daily stand-up
  • B. At the System Demo
  • C. During PI Planning
  • D. At the Inspect and Adapt event

Answer: C

Explanation:
Collaboration with System Architects and the Systems Team is likely to have the greatest impact on Solution development during PI Planning. This is the time when teams plan their work for the upcoming Program Increment, and involving System Architects and the Systems Team can ensure that architectural considerations, dependencies, and technical requirements are properly addressed. Their input helps align the technical direction with business goals, identify potential risks, and plan for the necessary enablers and infrastructure needed to support the development efforts.
SAFe Scrum Master References
* SAFe PI Planning guidelines
* SAFe 5.0 framework: roles of System Architects and Systems Teams in PI Planning


NEW QUESTION # 48
What is the purpose of the Large Solution level in SAFe?

  • A. To regulate large batch delivery across multiple ARTs at the Solution level
  • B. To coordinate the work of multiple Agile Teams on the Agile Release Train (ART)
  • C. To coordinate multiple Agile Release Trains that develop the same Solution
  • D. To create large Portfolio-level Solutions that the ART can use to create organizational alignment

Answer: C

Explanation:
* Large Solution Level in SAFe:This level is designed for enterprises where multiple Agile Release Trains (ARTs) and suppliers collaborate to build and deploy complex solutions that require coordination beyond a single ART.
* Purpose:The Large Solution level provides the practices, roles, and artifacts necessary to coordinate the efforts of multiple ARTs:
* Solution Train:A structure that manages the delivery of large solutions, aligning the efforts of multiple ARTs.
* Solution Management and Solution Architect/Engineer:Roles responsible for defining the solution's vision, roadmap, and architecture.
* Solution Backlog and Solution Kanban:Tools to manage and prioritize work across multiple ARTs.
* Coordination:The primary focus is on ensuring that all ARTs are aligned, integrated, and delivering
* cohesive, high-quality solutions.
SAFe Scrum Master References:
* The SAFe framework details the Large Solution level and its role in coordinating the efforts of multiple ARTs to deliver complex, enterprise-level solutions.


NEW QUESTION # 49
What is one way a Scrum Master leads the team's efforts for relentless improvement?

  • A. By focusing on technical discipline
  • B. By building a high-performing team
  • C. By scheduling team meetings
  • D. By helping teams become better problem solvers

Answer: D

Explanation:
One way a Scrum Master leads the team's efforts for relentless improvement is by helping teams become better problem solvers. This involves coaching and mentoring the team in effective problem-solving techniques, facilitating problem-solving workshops, and encouraging a mindset of continuous improvement.
By empowering teams to identify and address issues autonomously, the Scrum Master supports the development of a high-performing, self-sufficient team.
SAFe Scrum Master References
* SAFe 5.0 framework: role of the Scrum Master in promoting continuous improvement
* SAFe Advanced Scrum Master learning materials: techniques for improving problem-solving skills within teams


NEW QUESTION # 50
......

Best updated resource for SAFe-SASM Online Practice Exam: https://prepaway.dumptorrent.com/SAFe-SASM-braindumps-torrent.html